Question 1:

E-Hailing Bicycle Management System

Case Study:
An e-hailing company that rents out bicycles needs a system to manage its bicycles, users, and borrowing process. Each user can borrow up to 2 bicycles at a time, specifically for families with children 18 years or below. The system must track the bicycles (name, make, type, and availability) and users (name, ID, and borrowed bicycles).
The company also wants to ensure that the system uses a multidimensional array to store information about the bicycles.

Requirements:

1. Add and View Bicycles:
2. Borrow Bicycles:
3. Return Bicycles
4. Display Borrowed Bicycles and Search for a bicycle
5. Create a menu-driven program to implement the above.

Sample Output:

  1. Add bicycles
  2. View all Bicycles
  3. Borrow bicycle
  4. Return bicycle
  5. View borrowed bicycles
  6. Search bicycles
  7. Exit
  8. Enter you choice:

Question 2: 

Pentagonal Numbers Problem Statement

Create a Java program that will display the first 40 pentagonal numbers. Hint: A pentagonal number is a figurate number that extends the concept of triangular and square numbers to the pentagon, but, unlike the first two, the patterns involved in the construction of pentagonal numbers are not rotationally symmetrical.

Expected Output:

1 5 12 22 35 51 70 92 117 145
176 210 247 287 330 376 425 477 532 590
651 715 782 852 925 1001 1080 1162 1247 1335
1426 1520 1617 1717 1820 1926 2035 2147 2262 2380
2501 2625 2752 2882 3015 3151 3290 3432 3577 3725

Question 3:

Passenger Rail Agency for South Africa Train Scheduling System Problem Statement
Design and implement a train scheduling system for Prasa railway network. The system should handle the following functionalities:
1. Scheduling trains: Allow the addition of train schedules, ensuring that no two trains use the same platform at the same time at any station.
2. Dynamic updates: Enable adding new train schedules and canceling existing ones.
3. Real-time simulation: Use multithreading to simulate the operation of trains (e.g., arriving, departing).
4. Data management: Use ArrayList to manage train schedules and platform assignments.

Requirements
1. Add Train Schedule, Cancel Scheduled Train, View Train Schedules and Platform Management
2. Concurrency Handling with Multithreading i.e Use threads to simulate train operations, Each train runs as a separate thread, simulating its arrival, departure, and travel status.
3. Use ArrayList to manage train schedules for each station, Platform availability.

Answers to Above Questions on Bicycle Management Systems

Answer 1: 

answer

Get answers to the above questions on bicycle management by hiring the best assignment helper in South Africa from Student Life Saviour experts.


Content Removal Request

If you believe that the content above belongs to you, and you don’t want it to be published anymore, then request for its removal by filling the details below. It will only be removed if you can provide sufficient evidence of its ownership.